Suzhou Hengxie Machinery Co., Ltd

Suzhou Hengxie Machinery Co., Ltd

Manufacturer from China
Active Member
8 Years
Home / Products / Rod Breakdown Machine /

1.7mm-4.2mm Rod Breakdown Machine , Aluminium Alloy Large Drawing Machine

Contact Now
Suzhou Hengxie Machinery Co., Ltd
City:suzhou
Province/State:jiangsu
Country/Region:china
Contact Now

1.7mm-4.2mm Rod Breakdown Machine , Aluminium Alloy Large Drawing Machine

Ask Latest Price
Video Channel
Brand Name :HXE
Model Number :13DL
Certification :ISO/SGS
Place of Origin :China(Mainland)
MOQ :1 set
Price :Negotiable
Payment Terms :T/T, L/C
Supply Ability :10 sets per year
Delivery Time :70-90 work days
Packaging Details :Packed with plastic film, U-steel under the machine, 40HQ,20GP container
Usage :Drawing
Inlet diameter :9.5mm
Outlet diameter :1.7mm-4.2mm
Main motor :160KW
Drawing material :Aluminium/Aluminium alloy
Power source :380V/50-60HZ
After-sale service :Engineer Available to Overseas
Product name :Rod breakdown machine
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

HXE-400/13DL aluminium wire rod breakdown machine

I. Quick Details

HXE-400/13DL Alinimium rod breakdown machine is used to draw single bare aluminium wire from 9.5mm to 1.7mm-4.2mm.The drawing capstans are arranged in a line that are able to work continuously with drawing speed and electrical control can be matched with each other.

II. Compositions of equipment

Name Quantity
1. Pay-off shelf 1
2. HXE-400/13DL Main drawing machine 1
3. HXE-180 Tension controller 1
4. HXE-SX630 Double spoolers 1
5. Electrical cabinet 1
6. Operation panel 1
7. Gear Oil System 1
8. Spare parts
9. Others

III. Main technical parameters

1. Inlet 9.5mm
2. Outlet 1.7mm-4.2mm
3. Diameter of capstans 400mm
4. Speed 1000m/min; Capacity say 1.7mm, 360KG.
5. Slip ratio 1.42-1.2
6. Quantity of capstan 14
7. Capstan Tungsten carbide
8. Quick dies change Available
9. Main motor AC 160KW
10. Fix speed motor AC 55KW
11. Gear Not Changeable
12. Noises of machine ≤85 db
13. Protection cover Installed
14. Gear Oil system 1 set

IV. Advantage and after-sale service

A: Advantage

(1). HENGXIE has some world famous parts suppliers, has special lubrication system for the gears and bearing.

(2). Body and other key components and parts are produced by our own factory , quality is reliable.

(3). Our company’s developing process in more than 10 years.

B: After-self service

Our company for all machine product, since the shipment date, our company free after sale maintenance service guarantee period is:

(1) 1 year for mechanical part.

(2) 6 month for electrical part.

Under these situation mentioned, the Seller will not take responsibility, but if the Buyer agree, will charge fees accordingly to repair the machine.

1. Due to wrong operation while shipping.

2. Due to Buyer`s wrong preparation that may cause damage to the machine.

3. Due to Buyer`s wrong operation that may cause damage to the machine.

4. Not in the consuming part list.

5. After agreement are made for the shipping, for any damage, Buyer should inform Seller in letter form to repair in seven days, If beyond the dare, Seller shall take no responsibility.

6. For any other failures due to acts of God (such as lightning, typhoon, earthquake, riots, war, fire or flood) and other factors that will cause damage, Seller shall take no responsibility.

7. Seller guarantee provide long term support regarding the parts and teach. After warranty, will charge accordingly.

V. Preparation before working

5-1. Check all parts lubrication conditions,

5-2. Check drawing lubrication oil, cooling water, steam, air pressure.

5-3. After checking, connect to power, according to the Electrical drawing, use foot switch, to make the machine operating in low speed (under 4m/s), if no Abnormal, then can begin to work.

VI. Operating procedures

6-1. Open power switch

6-2. According to the wire diameter, choose the dies (Check the die list).

6-3. Use pliers to break the wire to get a smaller section.

6-4. Use pliers to make the wire through the dies, then pull the wire out (Use foot switch to make the machine running in a low speed to make the wire move).

6-5. Wire direction, please check the Drawing for Wire path.

6-6. After make the wire through all the parts, close the annealing door and the spooling door, make the tension swing arm in the lowest position. and in running, the balance arm should be in the horizontal line. No big shake, no up and down frequently.

6-7. Open the Annealing switch, open the Pump, open and adjust the Drawing lubrication oil, Cooling water, Steam, Compressed air.

6-8. Set the length meters, then press the Start button to start the machine.

1.7mm-4.2mm Rod Breakdown Machine , Aluminium Alloy Large Drawing Machine

Inquiry Cart 0