Add to Cart
HXE-24DS Fine copper wire drawing machine
I. Quick details
24DS Fine copper wire drawing machine is used to draw copper wire from 0.5mm-1.0mm to 0.08mm-0.25mm.
II. Components
Name | Quantity |
1. Pay-off shelf | 1 set |
2. HXE-24DS Fine copper wire drawing machine | 1 set |
3. Bobbin Unloading device | 1 set |
4. Spare parts | As per List |
5. Operation manual |
III. Specifications
1. Inlet size: 0.5mm-1.0mm
2. Outlet size: 0.08mm-0.25mm
3. Speed: 2500mpm, Capacity: 0.2mm, 30kg/h; 0.3mm, 37kg/h; 0.4mm, 46kg/h; 0.5mm, 52kg/h.
4. Dies number: 24
5. Slip ratio (Area reduction) : 13%+ 8%
6. Wire drawing mode: vertical-mode and 4 axes
7. Driver: by dual Inverters control, Brand: Inovance,Chinese famous brand, 15kw+3.7kw.
8. Main motor: 15KW AC 3 phase motor
9. Spooler motor: 3.7KW AC 3 phase motor
10. Motor brand: Wan Nan motor, China classical brand
11. Capstan: Ceramic plasma
12. Max capstan diameter: 242mm
13. Max fix speed capstan: 207mm
14. Machine structure: Cast iron
15. Reverse system: PID synchronous control spool
16. Transmission: Flat belts
17. Pay-off method: Over-head
18. Tension control: Weight balance by swing arm
19. Lubrication type: spray, Grade 2.5%-3%, Capacity 40L/min,
20. Bobbin size: 300mm, material steel, 17kg.
21. Take up: Shaft type
22. Bobbin capacity: 50-60kg/max
23. Brake: Magnetic brake
24. Power source: Customize
25. Machine dimension: L2050mm*W1600mm*H1590mm, Machine weight: 2500KG
IV. Advantage and after-sale service
A: Advantage
(1). HENGXIE has some world famous parts suppliers, has special lubrication system for the gears and bearing.
(2). Body and other key components and parts are produced by our own factory , quality is reliable.
(3). Our company’s developing process in more than 10 years.
B: After-self service
Our company for all machine product, since the shipment date, our company free after sale maintenance service guarantee period is:
(1) 1 year for mechanical part.
(2) 6 month for electrical part.
V. Maintenance and precaution of machine
1. keep the capstans and machine clean, sweep off any accumulated copper chip and waste.
2. Keep inside of the take-up box dry and clean
3. Replace any aging or damage straps in time.
4. Lock up the electric control box (Operators are not allowed to do any repair, testing or change any parameter)
5. Any maintenance work on electric parts can be carried out only by qualified electrical technician.
6. Strictly forbid any change or modification of the inverter parameter.
7. Pls replace the lubrication oil when the machine runned one year.