
Add to Cart
HXE-17DS Intermediate Aluminium wire drawing machine
I. Quick details
HXE-17DS Intermediate Aluminium wire drawing machine is used to draw Aluminium wire and Aluminium alley from 3mm-4mm to 0.4mm-2.5mm.
II. Parameters
1. Inlet diameter: 3mm-4mm; Outlet diameter: 0.4mm-2.5mm
2. Speed: 0.7mm, 1300mpm, 80kg/h; 1.5mm, 1000mpm, 280kg/h; 2.0mm, 800mpm, 400kg/h.
3. Maximum dies number: 17
4. Outer diameter of the dies: 30mm * 15mm thickness 20mm * 10mm thickness
5. Slip ratio of m/c: 18.18%+13.5%
6. Main motor: AC 45KW, with 45KW Inverter.
7. Spooler / Coiler motor: AC 15KW, with 15KW Inverter
8. Loading of capacity: 480kg/max for DIN630mm Iron bobbin
9. Suitable diameter of bobbin: DIN 500mm/630mm
10. Brake: pneumatic brake
11. Capstan: Tungsten carbide
12. Capstan diameter: 254mm
13. Fix speed capstan diameter: 252mm
14. Machine Frame: Casted
15. Power transmission: Triangle belts
16. Machine dimension: 3500mm*1200mm*1250mm, Machine weight: 4500kg
III. Compositions of equipment
Name | Quantity |
1. Positive pay off machine for DIN630 | 1 set |
2. HXE-17DS Drawing machine | 1 set |
3. HXE-180 Tension controller | 1 set |
4. HXE-WS630 Single spooler | 1 set |
5. HXE-SX630 Double spoolers | Optional |
6. HXE-WF500 Trunk coiler | Optional |
7. HXE-WF750 Drop Coiler | Optional |
8. Operation panel | 1 set |
9. Electrical cabinet | 1 set |
10. Gear Oil Cooler+Gear Oil pump | 1 set |
11. Spare parts | 1 set |
IV. Advantage and after-sale service
A: Advantage
A. HENGXIE has some world famous parts suppliers, has special lubrication system for the gears and bearing.
B. Body and other key components and parts are produced by our own factory , quality is reliable.
C. Our company’s developing process in more than 10 years.
B: After-sale service
Our company for all machine product, since the shipment date, our company free after sale maintenance service guarantee period is:
(1) 1 year for mechanical part.
(2) 6 month for electrical part.
V. Operation&Maintenance
5-1.Preparation before running
Check all the lubrication parts of the transmission parts.
Check Wire-break Auto stop device, Safety doors.
Check coolant water, Lubrication oil, Steam, Compressed air.
After checking, jogging machine as lower than 5m/s, check all parts again.
5-2.Operation
Connect power.
Prepare the drawing dies.
Prepare the wire pointing and threading.
According to the die list, place the wires on the capstan, wire goes through each layer 2-3 times.
Put wire through the fix speed capstan then through the annealer machine
Annealer machine wire path, please check the Wire path drawing on the machine.
Then put wire through the Wire passing wheels, Tension device, Spooler machine.
After the wire path, close Safety door, adjust Drawing lubrication oil, Coolant water, Steam, Compressed air.