Add to Cart
HXE-24H Copper wire annealing machine
I. Quick description
24H Copper wire annealing machine is used to annealing 0.1mm-0.32mm single bare copper wire.
II. Main compositions
1. Pay off 1 set
2. Furnace and Frame 1 set
3. Fan 1 set
4. Tinning oven 1 set
5. Dry oven 1 set
6. Single traction motor machine 1 set
7. Spooler 1 set or 2 sets
8. Electric cabinet 1 set
III. Main technical parameter
Machine type | HXE-40H | HXE-32H | HXE-24H |
Number of wire | 40 | 32 | 24 |
Wire diameter | 0.1mm-0.32mm | ||
Max.line speed(mpm) | 300mpm | ||
Pay-off method | Hairbrush or tension control type | ||
Annealing method | Tubular annealing | ||
Tinning method | Double furnace hot dip (traversing tinning) mould tin-scraping | ||
Take up method | Single spooler torque motor spooling | ||
Annealing length | 5m | ||
Spool bobbin size | PT5-PT25(customized) | ||
Leading method | Seperately hang off or intergrated type | ||
Installed thermal power | 67.2KW | ||
Installed dynamic power | 12KW | 10KW | 9KW |
Total installed power | 79.2KW | 77.2KW | 76.2KW |
Traversing control | Decelerate motor , loading&unloading traversing | ||
Dimension(L*W*H)(mm) | 19300*2200*1600 | 19000*2200*1600 | 18800*1600*1600 |
Weight(kg) | 3500 | 3400 | 3000 |
IV. Preparation before working
4-1. Check all parts lubrication conditions,
4-2. Check drawing lubrication oil, cooling water, steam, air pressure.
4-3. After checking, connect to power, according to the Electrical drawing, use foot switch, to make the machine operating in low speed (under 4m/s), if no Abnormal, then can begin to work.
V. Operating procedures
5-1. Open power switch
5-2. According to the wire diameter, choose the dies (Check the die list).
5-3. Use pliers to break the wire to get a smaller section.
5-4. Use pliers to make the wire through the dies, then pull the wire out (Use foot switch to make the machine running in a low speed to make the wire move).
5-5. Wire direction, please check the Drawing for Wire path.
5-6. After make the wire through all the parts, close the annealing door and the spooling door, make the tension swing arm in the lowest position. and in running, the balance arm should be in the horizontal line. No big shake, no up and down frequently.
5-7. Open the Annealing switch, open the Pump, open and adjust the Drawing lubrication oil, Cooling water, Steam, Compressed air.
5-8. Set the length meters, then press the Start button to start the machine.